A partial wall collapse required the experienced Durawall team to rectify. We don’t normally do knock down rebuilds but our client had received very expensive quotes so we obliged and were engaged to engineer a new cost effective solution.
The existing wall was a mix of formed concrete and stacker block. We removed the whole lot due to concerns that the remaining wall could also fail. Ther large slabs of concrete were cut up to enable safe removal for recycling.
The new wall was up to 2.4m high. There was sewage and stormwater infrastructure to cross which required specific engineering design for each.
The client chose the Timber Rustic Charcoal sleeper which is great looking sleeper.
Some of the spans needed to have double sleepers for extra strength. With the larger posts there is room for two sleepers. Single sleepers need to be chocked to hold them in place before back filling.
The result was an attractive engineered structural wall. A real feature of the site.