Commercial
Buderim Housing Development
Durawall engineered and constructed bio retention walls for this subdivision in Buderim.
Durawall engineered and constructed bio retention walls for this subdivision in Buderim.
Durawall was engaged to remove a rotten timber retaining wall and fence and construct a new concrete retaining wall.
Durawall was used in the upgrade of this substation. Energex required a low maintenance long term solution.
Durawall was commissioned to supply 1500 square metres of Durawall concrete sleepers for Narangba Heights Estate.
Trading Hours: Mon – Fri 7.30am – 3.30pm
Pick Up Hours: Mon – Fri 7.30am – 2.00pm
LICENSE APOLLO CMS PTY LTD QBCC 1048052 | ABN 98 691 951 459
copyright © 2024 Durawall Pty Ltd